Wednesday, 30 April 2014

Commissions Unit: Shot list Salvation Army

For our second trip to the Salvation Army we need to get these shots:

  • picture of people on the high street
  • Job Centre sign/front of shop
  • person walking up the stairs with shopping bags, front and back shot
  • shot of interviewees hands
  • family meal shot 

Commissions Unit: Shot List for Second Shoot

This is the shots that we need to get for our second shoot at the Food Bank warehouse:


  • POV sifting through donations including their hands
  • wide shot of warehouse using tripod
  • person pick up can from shelf
  • put can in trolley
  • someone filling out a foob bank voucher 
  • shot of the map using tripod
  • food parcel to be made, side view, POV view
  • walking with the trolley down an isle and putting food in the trolley

Tuesday, 29 April 2014

Commissions Unit: Fine Cut Practice Workshop


This is the sync assembly but with cutaways over the top so you don't see the jump cuts between the editing.
This is front the work shop with John Ramsden.

Commissions Unit: Sync Assembly practice Workshop


This is a practice to help us do a sync assembly for our documentary, the footage is of the apprentices at Canterbury Cathedral building the new stain glass window.

This is the footage from the workshop with John Ramsden.

Saturday, 26 April 2014

Commissions Unit: Transcripts


This is the Transcript for Kevin the warehouse manager.


Commissions Unit: Transcripts


This is the transcript from Ian's interview, which was our longest interview. I crossed out everything i thought was not useful and that the rest should make sense.

Commissions Unit: Transcripts

This is the transcript form Graham's interview, everything i crossed out we decided not to use and the rest would make up sentences we would put in the Documentary.