Monday, 22 February 2016
Major Project: Sunday League Post-Production Schedule
This production schedule was made on the basis from the pre-production schedule as everyone could understand it and thought it was good so I wanted to keep the post production schedule similar for the boys and me to keep tracks.
After us all having a discussion based on time scales of what we thought was reachable and would work we came up with rough dates for each version of the edit - so that once this date would come around we would arrange for someone to watch the edit and see how it was coming along, plus to arrange for Simon to see it once we made it to each time and see if we are keeping to the scale.
Chris said that he felt this time scale was achievable as an editor and that each deadline would be reached but if he needed more time we could move things around.